Hello, welcome to the official website of Lesilong New Material Technology (Shenzhen) Co., Ltd.!
Service hotline:86-755-23499577
Lesilong New Material Technology (Shenzhen) Co., Ltd.
Committed to the design, production, installation and surface coating of aluminum products
Square seamed column aluminum veneer
  • Square seamed column aluminum veneer
  • Square seamed column aluminum veneer
Square seamed column aluminum veneer

Square seam wrapped column aluminum veneerThe square column, which was originally a space obstacle, has become a beautiful scenery line after the decoration of the designer. This is the charm of the square wrapped column aluminum veneer. It can be widely used in gas stations, gymnasiums, subway high-speed railway stations, etc., to increase visual highlights.

Installation of square seam wrapped column:

(1) Set out, fix the steel framework, and spring the orientation of the framework to the bottom layer. The skeleton is fixed on the main structure. Check the quality of the main structure before setting out.

(2) Fix the connector of the skeleton, and weld the connector on the column of the main structure to fix the skeleton.

(3) Fix the skeleton and conduct anti-corrosion treatment after welding. The installation framework shall have accurate orientation and firm structure. Check the center line and surface mark after installation.

National Service Hotline:
86-755-23499577

1563775888749133.jpg
1563775889428319.jpg

Square seam wrapped column aluminum veneerThe square column, which was originally a space obstacle, has become a beautiful scenery line after the decoration of the designer. This is the charm of the square wrapped column aluminum veneer. It can be widely used in gas stations, gymnasiums, subway high-speed railway stations, etc., to increase visual highlights.

Installation of square seam wrapped column:

(1) Set out, fix the steel framework, and spring the orientation of the framework to the bottom layer. The skeleton is fixed on the main structure. Check the quality of the main structure before setting out.

(2) Fix the connector of the skeleton, and weld the connector on the column of the main structure to fix the skeleton.

(3) Fix the skeleton and conduct anti-corrosion treatment after welding. The installation framework shall have accurate orientation and firm structure. Check the center line and surface mark after installation.

Related product recommendation
Contact Us
Lesilon new material technology (Shenzhen) Co., Ltd
Address: 101, building B, Yixing Industrial Zone, Minsheng 1st Road, Baoyuan community, Shiyan street, Bao'an District, Shenzhen
Contact: 13640954348 Mr. Zheng
Tel: 86-755-23499577
Fax: 86-755-23499552
Email: szzdpd@163.com
website:http://www.lsl-sz.com

86-755-23499577

National consultation hotline

Discover more
copyright © Lesilon new material technology (Shenzhen) Co., Ltd. All Rights Reserved Guangdong ICP No. 20039765