Hello, welcome to the official website of Lesilong New Material Technology (Shenzhen) Co., Ltd.!
Service hotline:86-755-23499577
Lesilong New Material Technology (Shenzhen) Co., Ltd.
Committed to the design, production, installation and surface coating of aluminum products
Customized flat seamless aluminum veneer
  • Customized flat seamless aluminum veneer
  • Customized flat seamless aluminum veneer
Customized flat seamless aluminum veneer
Flat seamless aluminum veneerThings used for building aluminum veneer of curtain wall: toothless saw blade cutting machine, hand electric drill, impact electric drill, nail shooting, various standard drilling flowers, wrench, screwdriver, hand hammer, ink line, wire sag, nylon wire, steel tape, electric welding machine, oxygen cutting equipment, driven sucker, electric hanging blue, glue injection, pneumatic riveting, safety belt, etc. Preparation before data mobilization: this part of work is the initial stage of the project. It should be completed on schedule, with quality and quantity guaranteed based on the construction service
National Service Hotline:
86-755-23499577

Flat seamless aluminum veneerThings used for building aluminum veneer of curtain wall: toothless saw blade cutting machine, hand electric drill, impact electric drill, nail shooting, various standard drilling flowers, wrench, screwdriver, hand hammer, ink line, wire sag, nylon wire, steel tape, electric welding machine, oxygen cutting equipment, driven sucker, electric hanging blue, glue injection, pneumatic riveting, safety belt, etc. Preparation before data mobilization: this part of the work is the initial stage of the project. It should be completed on schedule, with quality and quantity guaranteed based on the construction service. The details are as follows: (1) after the contract is signed, the planners should put forward the material scheme of the project in a short time according to the construction drawing and curtain wall project scheme drawing of the project.

(2) The project management department and the production department shall cooperate with each other to make the processing plan of the project according to the construction schedule and the actual situation of the project site, reasonably arrange and arrange the production, and ensure the timely participation of products. Equipment process flow: setting out → connecting parts of fixed framework → fixed framework → equipment aluminum plate → closing structure treatment → inspection of equipment precautions for building curtain wall aluminum veneer. The type, quality, color, pattern and line of curtain wall aluminum veneer shall meet the planning requirements.

In addition, it is also possible to use a concave mold with a sharp cone angle to achieve a balance in force. A component force occurs parallel to the outer surface of the cone, and the direction is parallel to the direction of the cone angle force. In addition, from the perspective of planning, the direction of this component force also needs to be in the opposite direction to the friction force of this component. This facilitates the deformation and movement of the metal. According to different production conditions, a suitable taper angle can be established through data calculation to offset the impact of friction. During the processing of aluminum veneer, when the metal parts deform and flow to the air port, the external metal movement will become slow due to the influence of friction. Because the two parts are the same whole, the two parts need to reach the balance of internal stress, which will greatly enhance the value of additional tensile stress.

A few days ago, the national standard of aluminum veneer passed. The professional review meeting of China's standard "aluminum veneer for construction and decoration" edited by China's construction data inspection and certification center and China's construction data inspection center was held in Dalian. The review meeting agreed that the preparation team had a careful mood, and the pictures of fluorocarbon aluminum veneers had done a lot of detailed, in-depth and extensive work. The review materials provided were complete, the verification tests were comprehensive and sufficient, the preparation instructions were reasonable, and the prepared standard text met the requirements of the relevant standard preparation in China. In this standard, the preparation team emphasizes the requirements for the original data; New products of aluminum veneer developed in recent years, such as ceramics, anodizing and powder spraying, are introduced and relevant requirements are put forward; The requirement of natural exposure is introduced; The test method of PVDF content in fluorocarbon coating resin was proposed; The product connection requirements and inspection methods are proposed.

Related product recommendation
Contact Us
Lesilon new material technology (Shenzhen) Co., Ltd
Address: 101, building B, Yixing Industrial Zone, Minsheng 1st Road, Baoyuan community, Shiyan street, Bao'an District, Shenzhen
Contact: 13640954348 Mr. Zheng
Tel: 86-755-23499577
Fax: 86-755-23499552
Email: szzdpd@163.com
website:http://www.lsl-sz.com

86-755-23499577

National consultation hotline

Discover more
copyright © Lesilon new material technology (Shenzhen) Co., Ltd. All Rights Reserved Guangdong ICP No. 20039765