Steps of seamless aluminum veneer ceiling device:
1、 Construction preparation:
1. Check the construction drawing and the field measurement scale in detail to ensure the perfection of the in-depth planning and processing. At the same time, carefully check with the structural node drawing, and correct the planning as soon as possible if any inconformity is found.
2. Check whether the quality of the arc keel meets the drawing requirements. The arc keel device meets the requirements of planning specifications. The connecting bolts of the anyway keel device shall not be omitted.
3. The material and processing dimensions of the metal adapter must meet the planning requirements, and the material must have a factory certificate and a retest report.
4. The connection between the adapter and the vertical keel shall be reliable, and the elastic pad shall not be omitted.
5. Check the material, surface color, strength, appearance and processing accuracy of aluminum plate to see if they meet the planning and national specifications.
(1) Check the processing accuracy of aluminum plate, such as length and width scale error, diagonal scale difference and opposite side parallelism error:
(2) Check the flatness of aluminum plate surface:
The plate surface is flat and checked with a 3M guiding rule, with an allowable error of 3mm. The vertical and horizontal plate surface shall be checked with 3M guiding rule, with allowable error of 2.5mm; the internal and external corners shall be checked with square rule, with allowable error of 2.5mm.
(3) Check that the error between the angle of one side of the aluminum veneer and the angle of multiple folding is within ± 0.50, and the radius of the aluminum angle folding meets the design requirements. It is formed in one time.
The above is the answer to the question of how to install the seamless aluminum veneer.
86-755-23499577
National consultation hotline